Challenges
One of the biggest challenges with this piece was time. I had 3 weeks to conceptualize, layout, light, animate and render all deliverables. I had 15 animations that needed to be delivered, so with that I had to dedicate the final week to rendering. The first week was dedicated to honing in the look and lighting of this piece, and then the second week I focused on animating everything. In the end, this piece helped Orb Aerospace gain the funding needed to expand their team and development.